This project will be a full-depth removal and replacement of a damaged section of the South Sare Road Multi-Use Path, just north of East Creeks Edge Drive. The contractor will remove 90 LFT of the damaged 8 FT wide multi-use path and replace it with a new hot mixed asphalt path as depicted in the typical cross-section.
Work is anticipated to begin in the Spring of 2020.
Quote Documents (Closed):
The Board received one quote from E&B Paving, INC. in the amount of $23,000.00
All Quotes were rejected by the Board of Public Works. Repairs for this section of path were performed by in-house crews.