This project will be a full-depth removal and replacement of a damaged section of the South Sare Road Multi-Use Path, just north of East Creeks Edge Drive.  The contractor will remove 90 LFT of the damaged 8 FT wide multi-use path and replace it with a new hot mixed asphalt path as depicted in the typical cross-section. 

Work is anticipated to begin in the Spring of 2020.

Quote Documents (Closed):

The Board received one quote from E&B Paving, INC. in the amount of $23,000.00

All Quotes were rejected by the Board of Public Works.  Repairs for this section of path were performed by in-house crews.

Project Contact:

Roy Aten
(812) 349-3423 or atenro@bloomington.in.gov

 

 

Attachments

Quote Packet (1.46 MB)
Site Plan (5.62 MB)