Current capital improvement projects managed through the Engineering Department.
N Walnut Resurfacing (Bypass to Old 37)
10th Street Safety Improvements
Jefferson St (8th to 10th) Sidewalk Project
West Kirkwood Avenue Improvements Project
Grimes at Walnut Signal Replacement
Winslow-Rogers (Allendale to Sare) Resurfacing
E 3rd Street South (Indiana to Rose) Protected Bike Lane Phase 2
Crosswalk Improvements Project, Phase 3
North Dunn Street Sidewalk Connection (17th to 18th)
S Washington St. Traffic Calming
N Dunn St Multiuse Path (Bypass to Clover)
W 3rd Street Maintenance Project (Franklin to Patterson)
Downtown Street Maintenance Project (4th, 6th, College, Walnut)
Indiana Avenue Safety Improvements
W. Countryside Ln. and Southern Pines Traffic Calming
E. Thornton/Arden Dr. Neighborhood Greenway
E. Longview Ave. Neighborhood Greenway
Downtown Accessible Parking Project
E Miller Dr Traffic Calming
Downtown Curb Ramps Phase 4
Crosswalk Improvements Project, Phase 2
Hillside & Olive/Weatherstone Intersection Improvement
On-Call Geotechnical Services
On-call Geotechnical Engineering Services Throughout the City
West Allen Connector
Hopewell West - Jackson Street
Design, platting and construction of Jackson St.
High St (Arden to 3rd) Multiuse Path and Intersection Improvements
Downtown Curb Ramps, Ph III
Downtown curb ramp reconstruction.
West 2nd Street Modernization and Safety Improvements
17th (Monroe to Grant) Multiuse Path
The project involves changes along 17th Street including construction of a multiuse path along the north side of the street, construction of accessible sidewalk curb ramps, street resurfacing, and replacement of the existing traffic signal at the intersection of 17th Street at Madison Street/Kinser Pike.
Hopewell East, Bloomington Hospital Re-Use (BHRU) Project
Demolition of existing buildings and full reconstruction of the area including new roads, Hopewell Commons Park, and a shared-use street.
1st Street (Fairview to College) Reconstruction
Complete reconstruction of 1st Street
Pre-Approved Consultant List
Jackson Creek Trail Phase II
An addition of 1.5 miles to the current Jackson Creek Trail
B-Line Connection Project
This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass.