This project will include multimodal safety and mobility improvements while addressing maintenance needs at multiple locations along the College Avenue and Walnut Street corridor as listed below. All work will be designed to be compatible with the results of the area’s corridor study to the maximum extent feasible, but the project will not fully implement the results of that study or change the one-way configuration of the streets. The project is programmed in the Metropolitan Planning Organization’s Transportation Improvement Program to use up to $5,109,406 of federal funding for construction.
Kimley-Horn and Associates, Inc was selected to perform preliminary engineering services for this project.
Project improvement locations are expected to include the following:
- Intersection Improvements, including traffic signal replacement
- College Avenue & 3rd Street
- College Avenue & 4th Street
- College Avenue & 11th Street
- Walnut Street & 1st Street
- Walnut Street & 4th Street
- Crosswalk Improvements
- College Avenue at Smith Street
- College Avenue at Old State Road 37
- College Avenue at 19th Street (extension)
- Walnut Street at 19th Street
- Walnut Street at Old State Road 37
- Sidewalk Improvements
- College Avenue between 1st Street and 2nd Street (east side)
Project Timeline:
- Design: 2027-2029
- Right of Way Acquisition: TBD if necessary
- Construction: 2030
Project Contact:
Neil Kopper
(812) 349-3593 or [email protected]