This project will construct improved crosswalks at multiple locations throughout the City. Additional location information will be available as the project progresses. Construction is federally funded with a local match. This project utilizes funding from the Highway Safety Improvement Program (HSIP).
A design consultant has yet to be selected. Project scoping should be complete by the end of 2027. Design and right-of-way acquisition (if required) will take place during 2027 and 2028. The project will be bid out for construction in mid-2029. Construction is tentatively planned for 2030. Schedules are subject to change.
Project Timeline:
- Design: 2027/2028
- Construction: 2030