Page last updated on August 27, 2026 at 3:20 pm
Provide Your Input!
As the City of Bloomington considers different forms of traffic calming along the E Rogers RD corridor, we want to ensure that the improvements represent what the community (you!) want and need.
An online comment form will be posted here by Sept 10th.
You may also email your comments to David Brantez, Alternative Transportation Coordinator, at [email protected].
Project Location
This project location spans E Rogers RD from High to Sare. Bloomington residents successfully applied to the Resident-Led Traffic Calming Program identified this area for study.
What is Traffic Calming?
Traffic Calming aims to manage vehicular speeds and volumes. The greatest benefits of traffic calming are increased safety and comfort for all street users. Compared with conventionally designed streets, traffic calmed streets typically have fewer collisions, traffic-related injuries, and fatalities. There safety benefits are the result of slower motor vehicle speeds that result in greater driver awareness, shorter stopping distances, and less kinetic energy during a collision.
Project Timeline
- Informational Neighborhood Letter
Note: Letters mailed to residents within 300ft of the project - Public Meeting - Preliminary Design Review & Feedback
September, 10 from 5:30pm - 6:30pm at the Sherwood Oaks Church (Enter through Door #5 and navigate to the Fireside RM)
2700 E Rogers RD, Bloomington, IN 47401 - Open Comment Period: Opening Sept 10, 2026
Online Open Comment Form will be linked here - Transportation Commission Review: September 26, 2026 at 5:30pm
City Hall Council Chambers and on Zoom - Installation: expected 2027