PROJECT DETAILS:

The Work includes replacement of the existing storm culvert system with a new 22’ x 4.75’ storm culvert approximately 470 feet in length with the upstream end comprised of aesthetically-treated concrete headwall and wingwalls. Also included are approximately 450’ of 24” sanitary interceptor sewer replacement and the installation of a small pump station, both with associated temporary bypass pumping. Installation of a new 235’ long 8” diameter watermain connection under the new storm culvert is included as an alternate. Restoration of the surface to conditions similar to existing are part of the project, including the reconstruction of the alley pavement, portions of the adjacent parking lots, a section of Indiana Avenue and affected sidewalk, lighting and landscaped areas. A detailed phasing plan to allow access to adjacent buildings and parking facilities is included, and maintenance of traffic and other work incidental and implied by the plans and specifications is to be included in the project lump sum cost.

 

 

BID DOCUMENTS:

 

 

MEETINGS & BIDDING DEADLINES:

PRE-BID CONFERENCE:

An in-person pre-bid conference will be held prior to the bid opening on October 13, 2023, 2023 at 10:00 a.m. to familiarize Bidders with this Project. The meeting will be held in person at City of Bloomington Utilities, 600 E. Miller Drive, Bloomington, in the Board Meeting Room.

 

BIDDING CLOSE DATE:

Sealed bids shall be received by the Utilities Department, at 600 E Miller Drive, Bloomington, Indiana 47401, at or before 4:00 PM local time on October 26, 2023.  Any bids received after the designated time will be returned unopened.  Bids will be publicly opened by the Utilities Service Board during the October 26, 2003 special meeting beginning at 4:00 PM local time.

 

BID AWARDS:

Award of the bid may be made during the regularly scheduled USB Meeting on November 6, 2023, or a subsequent meeting of the Board.

 

MANDATORY PRE-CONSTRUCTION MEETING:

Meeting will be held with the Contractor prior to the start of construction. 

 

 

PROJECT CONTACT:

Jane Fleig, Project Manager

(812)349-3631 or fleigj@bloomington.in.gov