4/28/2025 09:39:35 Closed by Cheyenne Bowlen
Duplicate
Other: Over the past 4 years, W. 1st street from Walker to edge of Hopewell (near Fairview) was used extensively, often daily, during demolition and construction with heavy equipment and trucks often idling there waiting to move closer to the Hopewell construction area. . As a result that end of the street as well as the curve onto Wylie/Euclid street experienced a lot of wear and tear; periodic potholes, sidewalks closed at times, spray painted utility markings. Are there any plans to pave and repair the street and shoulders that are technically in McDoel Gardens? It definitely would show a measure of goodwill for all that the near neighbors and businesses have experienced as Hopewell emerges. W. 1st towards Rogers and onward looks great with paving, new sidewalks and street lamps.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 2 days have already passed.
Duplicate
City | Bloomington |
---|---|
State | IN |
Latitude | 39.169925689697 |
Longitude | -86.536804199219 |