closed #212923
City Construction Projects
902 S Sheridan Dr
- Case Date:
- 8/7/2026
Abandoned detour sign lying in grass on SW corner of E Maxwell and S Sheridan. Leftover from drainage project @ E First and S Mitchell
Abandoned detour sign lying in grass on SW corner of E Maxwell and S Sheridan. Leftover from drainage project @ E First and S Mitchell
There is construction happening in the alleyway of 111 E 6th St, which is behind the Btown Smoke Time (corner of walnut and sixth). My apartment is in this alleyway, and there is no other access besides the alley door. The construction is currently blocking me from entering my apartment, and is blocking my roommate from leaving the apartment, because they have torn the alley out and blocked any alley entrance with heavy machinery. While I’m sure this was a necessary project, this is something that needs to be informed to residents if they are going to be blocking them inside/outside of their homes.
Construction crew blocking the sidewalk. No flagger. Pedestrians forced into Street. Thank you.
Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.
Following up on case #210922. The plate is still here and now has profanity spraypainted on it.
Recently we have had sewer problems at 1901 S. Rogers Street Bloomington. Upon digging up the main line we found what appears to be a fiber optic line that severed our main sewer line when contractors were working recently. Could we please find out the contractors that had ROW or who to contact. We are a no profit agency and do not have the budget for this costly repair. Thank you.
Soil washing away under side walk. I have reported this area before and it seems to be getting worse. Is there a plan?Thank you for your time. Kaye Beavers, Peppergrass landscape director
Previous city project. Soil washing away under sidewalk
When paving projects done by old hospital
The current construction project on 2nd street is extremely disruptive and causes the building to shake. For necessary/emergency daytime construction this is totally understandable, but the project on 2nd st (between Walnut/Rogers) has been doing construction only from late evening to overnight around 4-5am every day. I have not slept since the construction started a week ago and it is scheduled to continue another full week. Even if there is a permit to be exempt from the noise ordinance, please consider rescheduling this work to take place during daytime hours. As I said, the deeper digging affects the foundation of the building, causing very irritating vibrations that give me headaches and make sleep impossible. It has affected my work life and mental health to miss so much sleep. My window faces the road and this has been an absolute nightmare of a time for me.