City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
2901 S Olcott BLVD
- Case Date:
- 5/5/2019
2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.
City Construction Projects
1301 W Woodhill DR
- Case Date:
- 9/5/2018
Cylinder electric box smashed over on ground next to street light
City Construction Projects
1375 W Allen ST
- Case Date:
- 7/11/2018
A tree fell on power lines next to Willows Apartments. It must've happened during the last storm. It's been several days and no one has done anything, so I wanted to make sure the City knew about it. Potentially hazardous, also blocks sight when pulling out of the Willows Apartments.
City Construction Projects
436 E Laurelwood DR
- Case Date:
- 1/18/2018
Thank you Bloomington Sanitation!
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.