uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (140)

open #188253

City Construction Projects

Case Date:
5/3/2024

Hello. If there is a better way to provide input please let the neighborhood know but we learned that self storage is going into Park Ridge East on Morningside. The industry is low-income predatory and operates on a model that intends for low engagement. This is the opposite for what should be at the intersection of a Greenway (Longview) and a major road (3rd). Surely there are more industrial locations for the city suited for such a business. It is not true commerce (which would be awesome in that area) but is "set it and forget it" investing. Ugly, wasteful, and most importantly the wrong choice for the location. Definitely build something, but something that people will regularly access and use.

closed #188162

City Construction Projects

1416 S Liberty DR

Case Date:
4/27/2024

What are all the barricades for along Liberty Drive? The start from Highway 45 and go quite a ways…

closed #188055

City Construction Projects

1019 E Miller DR

Case Date:
4/18/2024

There is a road drain across the street from me, North side, and I notice the drain there has the beginnings of cavitation, which if it goes, could be dangerous

open #188054

City Construction Projects

Miller & Highland

Case Date:
4/18/2024

I've lived in this neighborhood for over 20 years, and the city put a hazard sign on the sidewalk months/years ago, but nothing else has been done to correct the problem, which can be quite dangerous at night

closed #188025

City Construction Projects

Case Date:
4/16/2024

I have questions Why They are working on 17th and Kinser intersection again.

closed #187817

City Construction Projects

E 7th St & N Grant St, Bloomington, IN 47408, USA

Case Date:
3/28/2024

There is a large put next to the sidewalk at 7th and Grant that has been there for over a week. It used to have caution tape around it, but that has since disappeared, too. I just don’t want anyone to fall in! Thanks!

closed #187659

City Construction Projects

Case Date:
3/18/2024

kyle why there fiber work near classic lane do you know when fiber work end

closed #187440

City Construction Projects

Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA

Case Date:
2/27/2024

At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.

closed #187409

City Construction Projects

Case Date:
2/23/2024

kyle i just saw sign said road work at new hospital on tuesday i dont know why can you check it out for me and let me know

closed #187393

City Construction Projects

Case Date:
2/21/2024

Fiber cable is being installed underground on West side of High. There is the smell of skunk/gas in the area. This is south of the High St/Hillside/Moores Pk intersection. Utility flags have not been installed by the contractors servicing the area. The neighborhood is concerned re digging into utilities.