closed #182309

City Construction Projects

Case Date:
12/22/2022

The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.

closed #182259

City Construction Projects

E 19th St, Bloomington, IN, USA

Case Date:
12/12/2022

The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience. No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.

closed #182217

City Construction Projects

E 3rd St, Bloomington, IN, USA

Case Date:
12/6/2022

There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.

closed #182215

City Construction Projects

409 E 3rd ST

Case Date:
12/5/2022

This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired

closed #182203

City Construction Projects

Case Date:
12/3/2022

Walkers need a pedestrian crossing signal and equally important, Pete Ellis road to hospital must complete its sidewalk all the way to this intersection. We walk to the hospital and here must walk in the street, where employees and patients sometimes race home to 10th St., not expecting walkers in the street. Help! It may be IU property that needs the sidewalk. Please muscle them to do so. Thank you!

closed #182195

City Construction Projects

Case Date:
12/3/2022

Orange barrels on 17th street , are creating a hazard pulling out of willis drive .

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.

closed #181800

City Construction Projects

7th & Washington, Bloomington, IN 47408, USA

Case Date:
10/12/2022

Hi there! It seems like every week there is an accident at the intersection of N Washington and 7th street. I’m wondering if you could put a stop sign there since it’s really dangerous for people driving and pedestrians crossing. Thanks!

closed #181765

City Construction Projects

1004 W 1st ST

Case Date:
10/10/2022

The contractor that did the construction in the basement did it without permits, it also violates the fire code. This facility treats disabled individuals struggling with mental health and addiction.

closed #181731

City Construction Projects

Case Date:
10/5/2022

Park Ridge East's traffic calming signs acquired through HAND have been destroyed repeatedly. Greenway improvements are to take place 2024 we are told? But any shortening of that timeline would be greatly appreciated. There is high speed, cut-through traffic, and people who desperately need something more than a plastic sign to convince them to drive safely.