closed #76297

City Construction Projects

E COVENANTER DR

Case Date:
10/9/1996

It is Mike's understanding that Covenanter Dr. is not to be used as an access road for construction of condos south of Eton Mews. Mike saw two dump trucks go through this morning that he thinks belongs to Rogers Group.

closed #183474

City Construction Projects

E 7th St, Bloomington, IN, USA

Case Date:
4/17/2023

Left on Washington and Lincoln intersection as well. The curb is creating issues because it sticks out to far. Can you please update this And if the vehicle cuts too close vehicle can be caught in the curb. Someone should check police reports and see how often police must do this. Pour gravel inside They need to be filled with concrete because there are weeds in the curb area. Concerned about people falling off of curb area worried about bicyclists falling in. Project feels unfinished

closed #187817

City Construction Projects

E 7th St & N Grant St, Bloomington, IN 47408, USA

Case Date:
3/28/2024

There is a large put next to the sidewalk at 7th and Grant that has been there for over a week. It used to have caution tape around it, but that has since disappeared, too. I just don’t want anyone to fall in! Thanks!

closed #182217

City Construction Projects

E 3rd St, Bloomington, IN, USA

Case Date:
12/6/2022

There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.

closed #182259

City Construction Projects

E 19th St, Bloomington, IN, USA

Case Date:
12/12/2022

The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience. No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.

closed #167192

City Construction Projects

Chase

Case Date:
1/24/2019

Large pothole on 2nd where BLine crosses going east

closed #170868

City Construction Projects

Bloomington, Indiana

Case Date:
11/2/2019

Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.

closed #174276

City Construction Projects

Bloomington, IN 47404, USA

Case Date:
12/5/2020

On the lookout deck by the parking lot, there is a missing grate, so there is a leg-sized hole in the concrete. There is also a lot of broken class on the ground at the end of the lookout deck.

closed #187372

City Construction Projects

Bloomington Hospital Heliport, 2651 E Discovery Pkwy, Bloomington, IN 47408, USA

Case Date:
2/19/2024

Why there road work at new hospital

closed #187440

City Construction Projects

Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA

Case Date:
2/27/2024

At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.