Search Results: (92)

closed #134785

Utilities Construction

1900 E Atwater AVE

Case Date:
10/15/2013

Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer

closed #134681

Utilities Construction

Case Date:
10/9/2013

rainwater is washing away soil from under his driveway from the work we did on spriggs,

closed #133925

Utilities Construction

7046 S Shields Ridge RD

Case Date:
9/4/2013

Resident (Shawn Waylen?) at 7046 S. Shields Ridge Rd. reports that repairs are needed to yard and driveway. The new 36" water transmission pipeline was installed in this area.

closed #155746

Utilities Construction

6000 S Handy RD

Case Date:
8/29/2013

On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.

closed #133758

Utilities Construction

6000 S Handy RD

Case Date:
8/28/2013

Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.

closed #133748

Utilities Construction

Case Date:
8/28/2013

Mark Todd from 5874 S. Handy Rd called and said fence and fence post was damaged when work was done. He says he will fix and will bill us, needs to know who to bill and where to send bill to. His phone # is 812-369-8300.

closed #133704

Utilities Construction

E 17th ST

Case Date:
8/27/2013

ON 17TH STREET EAST OF WALNUT GROVE, THE PAVEMENT IS SINKING IN DUE TO A STREET CUT

closed #133411

Utilities Construction

3246 S Coppertree DR

Case Date:
8/15/2013

Customer wanted supervisor to call her, she has a question RE: project on coppertree drive

closed #133410

Utilities Construction

420 W 2nd ST

Case Date:
8/15/2013

clooged storm drain, excessive growth

closed #133368

Utilities Construction

2800 E Buick Cadillac BLVD

Case Date:
8/13/2013

Hole is developing above storm drain pipe