Business
S Acadia Ct, Bloomington, Indiana, 47401
- Case Date:
- 12/15/2018
Weve been using yellow cab for quite some time now. Once or twice a day at least for the last few months. Its getting to a point where they don't answer their phones because their isn't a dispatcher. Or they take hours to show up. Thats not the problem though. The issue is we'll keep calling until someone answers and they pick up the phone cussing us out telling us there isn't no drivers before we can even get a word out. Ive been late to work multiple times, and the disrespect is too much to deal with. Especially when we pay a lot for their services. If this is how the city of bloomington treats people, we have a problem.
- Case Date:
- 12/26/2018
Juanita‘s restaurant has recently installed two of these LED security lights illuminating their parking lots. They produce at least 20,000 lm each. I live a block away, And I can literally read a newspaper from the light that comes through my window. I believe the luminosity of these lights is in violation of city code for lumens per acre.
Business
2001-2499 W Industrial Park Dr, Bloomington, Indiana, 47404
- Case Date:
- 1/26/2019
Stage Flight Circus Arts is allowing a junior coach to live in a studio upstairs in a business district. The arrangement makes many students very uncomfortable in an environment they feel should be a safe space.
City Construction Projects
720 W 7th ST
- Case Date:
- 9/9/2019
I may have sent this to the wrong department earlier today. Cars are parking regularly in front of the hydrant on the North East corner of Maple Street at West 7th. Can you please come and repaint the curb? You guys did a great job repainting the curbs on W 7th but the curbs on Maple need it too. Thanks.
City Construction Projects
600 W 6th ST
- Case Date:
- 9/12/2019
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.
City Construction Projects
301-399 S Mitchell St, Bloomington, Indiana, 47401
- Case Date:
- 10/10/2019
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
City Construction Projects
Bloomington, Indiana
- Case Date:
- 11/2/2019
Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.
City Construction Projects
3073-3099 E Moores Pike, Bloomington, Indiana, 47401
- Case Date:
- 12/6/2019
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
4612 W Arlington RD
- Case Date:
- 11/15/2018
Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...