uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (267)

open #209477

Business

Case Date:
3/23/2026

Case #209315 indicates that the City will not do anything about the blocked street and sidewalks in front of 1316 S Palmer because there is no evidence of a illegally run business. Please Google Jabberwocky Computer Rescue Services, which is listed as a currently open business at this location. Neighbors can hear his business landline ring at all hours of the day. People are laying underneath cars with the lower portion of their bodies out in the middle of Palmer. It’s a dangerous situation for everyone, especially the people employed by this business. https://maps.app.goo.gl/CjM5jGsxsrcbaQqi6

open #210008

Business

2894 E 3rd ST STE 120

Case Date:
4/17/2026

The accessible stall in the College Mall men's food court restroom does not stay locked or closed. I have submitted contact forms to the mall 3 times this year. No communication response or action from the mall. Anything you can do to help?

open #210882

Business

528 S College AVE

Case Date:
5/20/2026

Repeat accessibility issues with College Ave Kroger. They keep putting displays in the sidewalk going to both of their entrances. It is not accessible to make a wheelchair partially roll across the ramp in order to enter their store. I have reported to employees multiple times about several different seasonal displays, but they keep putting new displays back out there in spots that make their entrance inaccessible.

open #206166

City Construction Projects

1205 1/2 S Rogers ST

Case Date:
10/7/2025

Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.

open #210561

City Construction Projects

936 W 2nd St

Case Date:
5/7/2026

2nd St is trashed from S Walker Street to Buildings Trade Park. Recent construction did a terrible job patching their work, it’s hazardous in many places.

open #210852

City Construction Projects

2nd St & Walker St

Case Date:
5/19/2026

Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up. Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.

open #210881

City Construction Projects

201 N Morton ST

Case Date:
5/20/2026

I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area

open #210880

City Construction Projects

350 W 7th ST

Case Date:
5/20/2026

I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area

open #203158

City Performance

1018 E Chris LN

Case Date:
6/4/2025

It’s was my understanding with the Malibu House and Jeff Jones that several houses on Chris lane had lost renting privileges . I still see the Malibu house is open and has renters . I thought all this ended June 1? Has something changed ?

open #210933

City Performance

N Jefferson St

Case Date:
5/22/2026

I.m writing to ask if anyone inspects the many new building buildings along Jefferson. Specifically I'm concerned about the numerous street cuts that are now present. This road was once a very smooth street and now it is bumpy as can be. Are these cuts going to be finished so that the road is back to the way it was? It was taxpayer money that paved that road initially and it should be properly repaired. I personally feel the City is way to permissive when it comes to allowing half assed repair of street cuts. All over town we have to drive over poorly finished utility cuts. The public should not have bear the hardship these cause. Please insure our streets are properly put back to normal after any construction.