closed #202952

City Construction Projects

414 E Cottage Grove AVE

Case Date:
5/26/2025

Cavity forming alongside water meter in ROW close to SW corner of lot.

closed #199237

City Construction Projects

822 S Fess Ave

Case Date:
11/6/2024

822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.

closed #199235

City Construction Projects

1202 e 1st st and 1208 1st st

Case Date:
11/6/2024

There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.

closed #178582

City Construction Projects

105 W 4th ST

Case Date:
1/12/2022

Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.

closed #176608

City Construction Projects

704 N. Parkridge Road, Bloomington, IN 47408, USA

Case Date:
7/18/2021

At 704 N. Park Ridge Road Ms. Kaye Hill reports that the sidewalk in front of her house is sinking and is adjacent to a storm drain. Sidewalk sink is helping to collect water and contribute to some flooding from recent rains. There are green and orange paint marks on the sidewalk there and it may already be on the list for repair. Please contact Kaye and take a look at the site to determine what can be done and advise Kaye. Thank you.

closed #173337

City Construction Projects

1005 S Covenanter DR

Case Date:
8/11/2020

The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn

closed #166562

City Construction Projects

4612 W Arlington RD

Case Date:
11/15/2018

Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...

closed #147579

City Construction Projects

205 E 17th ST

Case Date:
8/22/2015

Water shut off cover missing

closed #147557

City Construction Projects

Indiana University, Bloomington

Case Date:
8/20/2015

Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.

closed #41837

City Construction Projects

1103 N Woodburn AVE

Case Date:
1/22/2003

Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.