City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
City Construction Projects
3950 W Tapp RD
- Case Date:
- 1/21/1997
MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
Indiana University, Bloomington
- Case Date:
- 8/20/2015
Subsidence of manhole cover. (Water)
I have seen no less than 3 people stumble due to 1/2" drop.
Maybe bevel edge of brick.
City Construction Projects
205 E 17th ST
- Case Date:
- 8/22/2015
Water shut off cover missing
City Construction Projects
4612 W Arlington RD
- Case Date:
- 11/15/2018
Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...
City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn