Skip to main content
Feedback

This project will improve crosswalks and curb ramps at 15 different locations throughout the downtown area.  The goals of the project will include improvements to pedestrian safety at intersections and provide a continuous ADA compliant route along 6th Street from Rogers Street to Indiana Avenue, and also along Washington Street from 9th Street to 2nd Street.

Project Timeline:

  • Design: 2018
  • Construction: 2019

Project Contact:

Roy Aten
(812) 349-3423 or atenro@bloomington.in.gov