This project would install a sidewalk on the south side of Moores Pike from College Mall to Woodruff Drive.

Project Map

Moores

Project Description

This project would install a sidewalk on the south side of Moores Pike from College Mall to Woodruff Drive. Funding for design and construction is provided through the Common Council Sidewalk Committee.

Crawford, Murphy & Tilly, Inc. is the engineering consultant for this project.

Project Timeline:

  • Design: 2017
  • Construction: Fall 2019

Bid Documents:

Bid Results:

Monroe LLC                           $241,559.00 (Invalid)

Crider & Crider, Inc.               $446,638.40

E & B Paving, Inc.                  $322,322.00 (Awarded)

Milestone Contractors LP.   $324,147.05

 

Project Contact

Russell White
(812) 349-3423 or whiter@bloomington.in.gov