This project will improve the intersection of 3rd Street and Woodscrest Drive. 

Project Map:

Woodscrest

Project Description:

The existing traffic signal infrastructure will be replaced with modern equipment (e.g. signal backplates, flashing yellow turn-left indications, etc.) and supplemented with enhanced pedestrian and accessibility features (e.g. curb ramps, push buttons, countdown indications, etc.). In addition, the intersection will be redesigned to improve the north-south alignment.

The project is included in the Bloomington/Monroe County Metropolitan Planning Organization (MPO) Transportation Improvement Plan (TIP) and is eligible for federal funding through the Highway Safety Improvement Program (HSIP). The project is programmed to receive $215,000 in federal funds for construction.

WSP - Parsons Brinckerhoff, Inc. is the design consultant for this project.

Michael Baker is the construction engineering consultant for this project.

A construction contract for this project has been awarded and construction is expected fall 2017. The attachment below shows a conceptual sketch of the planned intersection improvements and is not a final design.

Project Timeline:

  • Design: 2016
  • Construction: 2017

Project Contact:

Matt Smethurst
(812) 349-3423 or smethurm@bloomington.in.gov