Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-04-2420 North Woodlawn Avenue, Between East 13th Street and E 12th Street June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
Bloomington Convention Center Skywalk Work 302 S College Ave June 30, 2026 to July 24, 2026
Weddle Brothers is requesting approval of a temporary right-of-way closure at South College Avenue to accommodate completing the enclosure at the connector portion of the Bloomington Convention Center Expansion Project that will span from the new expansion on the east side of South College Avenue to the west side of College Avenue. The request includes temporary closures of: the western sidewalk, the existing eastern pedestrian diversion, and College Avenue south of 3rd Street, as necessary to safely complete the work. The closure(s) are proposed from June 30, 2026 through July 24, 2026. Pedestrian and vehicular traffic will be maintained, shifted, or rerouted in accordance with the approved maintenance of traffic plan. In addition to the right-of-way closure requests Weddle Brothers has also submitted a noise permit application that would only be used to meet the deadline of reopening the right-of-way on July 24, 2026.
External Project
LINESTRING(-86.5349109547624 39.164474784477534,-86.53491999233634 39.16405201798375)
ROW2026-04-2431 3274 E Moores Pike July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
ROW2026-04-2445 3108 E Kensington July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))
CBU - Sanitary Sewer Maintenance East Cottage Grove Avenue between North Walnut Street and North Washington Street July 2, 2026 to July 17, 2026
CBU crews will be installing a sewer main along East Cottage Grove Avenue, beginning at North Washing Street. East Cottage Grove will be closed to thru traffic for the duration of work.
Utilities
LINESTRING(-86.53234700778071 39.1725398169591,-86.53354407035673 39.17254764834726)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
Lane Closures on Fiber Project Path E 7th N Lincoln N Dunn E/W alley between Lincoln and Indiana July 6, 2026 to July 17, 2026
Multiple lane closures over a week or two long fiber boring and overlashing.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52701998894328 39.16826294123524,-86.52699119117905 39.16826591813478,-86.52699119117905 39.16800395049191,-86.52823909429638 39.1680158581332,-86.52823525459448 39.1682852679788),LINESTRING(-86.53022808893368 39.16803168164208,-86.52983073823044 39.16802818090548),LINESTRING(-86.5310775935421 39.168512485667605,-86.53108436694568 39.16804686321447,-86.53023317589225 39.16803110901742))
HUB 2 sanitary Connection 205 E 17th Street July 6, 2026 to July 20, 2026
Two week closure on Walnut between 17th with local access to be maintained.
External Project
LINESTRING(-86.53372368807746 39.18140720010746,-86.53355911502413 39.1803037221253,-86.53348505702456 39.179053517953946)
ROW2026-06-2584 4395 E Moores Pike July 6, 2026 to August 13, 2026
Lane closure for pole installation and boring
Engineering
LINESTRING(-86.47569623355817 39.15023118451643,-86.47368728904725 39.15026720584359)
Single Lane Closure on SB College / Western Lane 205 N College Ave July 7, 2026 to July 21, 2026
2 weeks closure of the western most lane of College Ave north of the 6th St intersection for crane placement. Sidewalks will have overhead protection and will remain open.
Engineering
LINESTRING(-86.5348974083971 39.167949327522194,-86.5348974083971 39.16769609459314,-86.53489882851021 39.16761572047287)
Milling and Resurfacing on E Burks Dr E Burks Dr from S Walnut St to S Walnut Street Pike July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Burks Dr from S Walnut St to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53133953547433 39.12668910659039,-86.53125499129068 39.126679016533416,-86.52996731833962 39.126679016533416,-86.52925844787667 39.12666892647502,-86.52904383571816 39.12665883641512,-86.52879020316718 39.12657811588406,-86.5280162987168 39.12583144658632,-86.52788623074197 39.12571540943077,-86.52777567296333 39.12565486823024,-86.52763910158973 39.12558928187099,-86.52747651662116 39.125574146548644,-86.52737896564003 39.125574146548644,-86.52675463936072 39.1255842367639)
Milling and Resurfacing on S Burks Ct S Burks Ct July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on S Burks Ct from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.52740230962944 39.12595740977994,-86.52735206473075 39.12432031420991)
ROW2026-06-2565 2222 E 3rd Street. July 13, 2026 to July 17, 2026
lane closure for gas line repairs
Engineering
LINESTRING(-86.50844786128641 39.1642534246121,-86.50816892862701 39.1642534246121)
Milling and Resurfacing on S Kennedy Dr S Kennedy Dr from E Burks Dr to the End of City Maintenance July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on S Kennedy Dr from E Burks Dr to the end of City maintenance for milling and resurfacing.
Street
LINESTRING(-86.52802883891027 39.12579911404927,-86.52827793058789 39.125637603223794,-86.52839689974735 39.1255135857314,-86.52848240883073 39.12537514734245,-86.52851215112058 39.12525978181051,-86.52850843333435 39.124905031615896,-86.52848612661695 39.12414361053149)
Milling and Resurfacing on E Willow Ct E Willow Ct from S Kennedy Dr to the Dead End July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Willow Ct from S Kennedy Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.52943729149659 39.1250326090983,-86.52854854188858 39.1250326090983)
Milling and Resurfacing on E Kennedy Ct E Kennedy Ct from S Kennedy Dr to the end of City maintenance July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Kennedy Ct from S Kennedy Dr to the end of City maintenance for milling and resurfacing.
Street
LINESTRING(-86.5293624568915 39.12363686784175,-86.52852792095958 39.1236348319253)
CBU - Sewer Main Maintenance West First Street between South Rogers Street and South Fairview Street July 14, 2026 to July 17, 2026
Beginning at 8:00 a.m. on Tuesday, July 14, 2026, City of Bloomington Utilities (CBU) will close a section of West First Street between South Rogers Street and South Fairview Street to complete sanitary sewer work in the area. The closure will remain in place for the duration of the work. Local access to residences and businesses will be maintained whenever possible. Motorists are advised to use alternate routes and use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53868715870698 39.15941064642669,-86.54103026072724 39.159419297962586)
Utility Cut Repairs at Landmark Medical Center 500-550 S Landmark Ave (Landmark Medical Center) July 15, 2026 06:00 am to 16:00 pm July 16, 2026
The Street Department will close one side of the entrance/exit per day to the Landmark Medical Center for utility cut repairs.
Street
LINESTRING(-86.55414540239272 39.16116024608877,-86.55413065024315 39.16113736925547)
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-06-2576 North Union Street July 15, 2026 to August 14, 2026
Lane closures, Full road closures and sidewalk diversions. Road closure detour route is Jefferson and North Sunset Drive and N Jefferson Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50942627906352 39.17146294151695,-86.50937095850257 39.17146294151695,-86.50936349123226 39.16934097157545,-86.50941384149044 39.16934357395394,-86.50940544978076 39.167761310068755,-86.50951118532292 39.16776391250565,-86.50952125537461 39.1693513810888,-86.50952629040043 39.16972612254301,-86.50952293371655 39.17024919581729,-86.50953132542627 39.17084382911773,-86.50954978718761 39.17141243437629,-86.50955146552955 39.17145667349425),LINESTRING(-86.50954978718761 39.1714605769445,-86.50942726822605 39.1714657815445))
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
2026 World Cup Final Community Watch Party Kirkwood between Walnut and Washington July 19, 2026
2026 World Cup Final Community Watch Party
Public Works
LINESTRING(-86.53356189610652 39.16658766677017,-86.53237059337584 39.16657354169689)
West Kirkwood Ave Safety improvements West Kirkwood Avenue; North Pine street to South Rogers Street will be closed to THRU traffic, Local Access only. The closure will not accept Thru traffic at Maple St. The Detour Route is: Patterson Drive to 2nd St to Rogers for east or west bound vehicles. July 20, 2026 to August 4, 2026
West Kirkwood Avenue will have intermittent lane closures for the duration of the project as well as 14 days of closure
Engineering
LINESTRING(-86.54941011754993 39.166728518060665,-86.54941011754993 39.166728518060665,-86.53889067543408 39.16661879811224)
Hub 2 sidewalk, curb, and drive apron reconstruction E 19th and N Lincoln July 20, 2026 to July 25, 2026
Concrete curb, driveway apron, and sidewalk repairs will be completed at the following locations: North Lincoln Street 1306–1308 N. Lincoln Street: Between 1306 and 1310 N. Lincoln 1400 N. Lincoln Street: Remove and replace the driveway apron and sidewalk as necessary to match the asphalt street grade. East 19th and 20th Streets Remove and replace damaged curb along E. 19th Street. 203 E. 19th Street: Remove and replace the driveway apron and curb. 202 E. 20th Street: Remove and replace the sidewalk, driveway apron, and curb. Maintenance of Traffic
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53232884294823 39.18142146254013,-86.53228764079233 39.1814193333517,-86.53228764079233 39.18138313713854,-86.53097191861362 39.18119576820797),LINESTRING(-86.53090640873748 39.1797004620409,-86.5309036619271 39.18033284363099),LINESTRING(-86.5308954214959 39.18039033258435,-86.53087232539454 39.18106910615168))
Hub 2 Sanitary Connection and Sidewalk remediation E 19th St July 20, 2026 to July 25, 2026
Lane and sidewalk closures for sidewalk, curb, driveway, and sanitary sewer work.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53370923531362 39.18149718631409,-86.53236813080618 39.18135164843295),LINESTRING(-86.53232789767094 39.181343851752246,-86.53096332383461 39.1811411377503))
LITTLE FIVE Film Park Avenue between 9th and 10th July 20, 2026
LITTLE FIVE Film
Public Works
LINESTRING(-86.5246590981843 39.171659894405565,-86.52464949761371 39.170472021927736)
LITTLE FIVE Film Grant Street from 8th to 6th Streets 7th Street from Lincoln to Dunn Streets July 20, 2026 to July 21, 2026
LITTLE FIVE Film
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52979341411067 39.16758243526408,-86.52979842249543 39.16944658262804),LINESTRING(-86.53103266091341 39.16855689724588,-86.5283554206238 39.16853172845612))
Lane Closure for Utility Spotting / Excavation East bound lane of E 10th St between Park and Woodlawn July 21, 2026 to July 22, 2026
Utility excavation east bound lane closure with flaggers.
Engineering
LINESTRING(-86.5246332914491 39.1716389141518,-86.52355879613077 39.17163732443751)
Fiber Work on College Mall Rd Southbound western lane closure oon College Mall Rd from E 3rd St to just south of E 2nd St. July 21, 2026 07:00 am to 17:00 pm daily for 2 times
Manhole work exploring preexisting routes for a new fiber pull. Some located in the street and some located on the sidewalks.
Engineering
LINESTRING(-86.49836459731429 39.16403488811716,-86.49812066471549 39.16261639160436,-86.49798650178613 39.16249345389298,-86.49776696244722 39.1609425289285,-86.4977913557071 39.160772303374415)
Westbound 6th St Closed with Detour 200 block of 6th St in front of Graham Plaza July 21, 2026 to August 4, 2026
Lane and Parking Closure for crane placement at Graham Plaza. Sidewalks will have overhead protection and remain open.
Engineering
LINESTRING(-86.5349373623325 39.16758017701497,-86.53530454492062 39.167583340096996)
North Bound Lane Closure for Utility Boring Park St north of E 10th. July 21, 2026 08:00 am to 17:00 pm daily until July 24, 2026
Half block north bound lane closure with flaggers on N Park to allow for a fiberoptic boring project.
Engineering
LINESTRING(-86.52463226596788 39.17171031473353,-86.52464317523379 39.17206341358934)
ROW2026-07-2594 302 East 18th Street July 21, 2026 to July 23, 2026
Road closure
Engineering
LINESTRING(-86.53071174945221 39.180339742246446,-86.5307305249153 39.18030439677824,-86.53033221687659 39.180224349622705,-86.53031746472702 39.18026177427819,-86.53071309055672 39.180339742246446)
CBU - Fire Hydrant Replacement Fire hydrant at 501 North Walnut Street July 22, 2026 08:00 am to 15:00 pm
Beginning at 8:00 a.m. on Wednesday, July 22, 2026, City of Bloomington Utilities (CBU) crews will replace a fire hydrant at 501 North Walnut Street as part of ongoing efforts to maintain essential water infrastructure. During the work, a temporary lane restriction will be in place on North Walnut Street from the intersection of West Ninth Street to approximately 150 feet north of the intersection. Residents and businesses in the immediate area may experience brief impacts, though crews will work efficiently to complete the hydrant replacement as quickly and safely as possible.
Utilities
LINESTRING(-86.53359888178419 39.170336707958285,-86.53361341927985 39.17089346882639)
Fiber Project Along W 3rd / Adams West and east bound lanes & bike lanes of W Adams and 3rd St from W Kirkwood Ave to I-69 July 23, 2026 07:00 am to 17:00 pm daily until July 24, 2026
Short term lane closures as fiber is pulled through a series of manholes in combination with some overlashing on existing poles.
Engineering
GEOMETRYCOLLECTION(POINT(-86.54965002018842 39.1666862511843),LINESTRING(-86.54965278767558 39.1666862511843,-86.54966662511134 39.16651674340079,-86.5496804625471 39.16642018815162,-86.54974134726446 39.16628715625785,-86.54993230387797 39.165988906420324,-86.55011772551705 39.16569709240568,-86.55037786930937 39.165276534784255,-86.55045535894965 39.16516924927416,-86.55059096582009 39.16501046641898,-86.55080959730515 39.16482593454231,-86.55103099627733 39.16468217100058,-86.5513188149412 39.16456201020296,-86.55157065627206 39.16449120106543,-86.55175331042412 39.16444399493409,-86.5519055222175 39.16442253759121,-86.55189721975604 39.164381768621666),LINESTRING(-86.55188338232027 39.16435816552328,-86.55200515175497 39.16435172831325,-86.55205496652373 39.16436889420535,-86.55244241472491 39.16437318567776,-86.55303188948837 39.16436889420541,-86.55357154948308 39.164371039941614,-86.55400327747887 39.164377477149884,-86.55503278269953 39.16439249730024,-86.55617298740631 39.16439893450658,-86.55618682484207 39.16445686933676,-86.55636117653268 39.16446759800377,-86.55648294596737 39.16449549253045,-86.55703921088501 39.16450622119157,-86.5576397555971 39.16450836692363,-86.5595188793735 39.164527678508904,-86.56285093390487 39.16455342728108,-86.56497636403786 39.16459419615106,-86.56696895478755 39.164592050421675,-86.56819495159607 39.164602779068076,-86.56948183312184 39.16461565344159,-86.56952888040342 39.164454723603114,-86.5700131906551 39.16445257786944,-86.57017923988423 39.16445043213571,-86.57025949701165 39.16444828640189))