Skip to main content
Feedback

Current opportunities to contract with the City of Bloomington on projects related to the Planning and Transportation department.

 

REQUEST FOR QUALIFICATIONS

The City of Bloomington (the City) is issuing this Request for Qualifications (RFQ) to aid in the selection of a consultant to provide temporary engineering services, as needed, during a time when the City has multiple unfilled engineering staff positions. Interested parties must submit a Letter of Interest (LOI) as outlined in this document no later than October 31, 2018 at 5:00 PM local time.

The information can be downloaded by Clicking Here.

Additional information may be obtained from:

Neil Kopper, PE
Interim Transportation & Traffic Engineer

koppern@bloomington.in.gov

Submission Deadline: October 31, 2018 at 5:00 PM local time.

 

City of Bloomington Specifications

The City of Bloomington specification uses the IDOT 2018 Standard Specifications unless otherwise noted.  Standard drawings and related links can be found on the City Engineers Resource Page.

CBU Specifications

Construction Specs and Standard Detail Drawings 2016

Affirmative Action Plan Requirements

Affirmative Action Requirements exist for projects exceeding $10,000.00. It is the responsibility of the Contractor to ensure that they have met the necessary requirements of the City of Bloomington's Affirmative Action Plan. Barbara McKinney, Human Right's Attorney/Director, can be reached at either 812.349.3429 or via e-mail at mckinneb@bloomington.in.gov

2018 Affirmative Action Documents