This project shall include, but is not limited to, removal of existing ramps and installation of ADA compliant ramps along W. 3rd from Jackson St. to S. Buckner St. There are (14) ramps that are to be ADA compliant and adhere to the 2016 INDOT Curb Ramp Specifications. Contractor shall coordinate with the City of Bloomington Planning & Transportation Engineer for placement and modifications of the ramps. The work will consist of furnishing labor, equipment and materials as described in the Specifications and Bid Documents.

Project Map:

Project Map

Project Description

The project will replace 14 curb ramps along West 3rd Street between South Jackson Street and South Buckner Street. 

Project Timeline

  • Design: 2017
  • Construction: 2017

Project Contact:

Phil Peden