City Construction Projects
323 S Grant ST
- Case Date:
- 4/5/2023
There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
- Case Date:
- 3/28/2023
At 414 S Lincoln there is a nasty utility cut, no warning sign and no other option than to drive over it. Hope it can be fixed soon. Thanks!
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
- Case Date:
- 3/9/2023
Several weeks ago on 8th Street in Hopewell The house in the corner had some kind of construction where the city road was tore up they have since left some of it was fixed but they're still an uneven spot on the road can we get this addressed and fixed?
City Construction Projects
- Case Date:
- 2/11/2023
Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.
City Construction Projects
- Case Date:
- 2/4/2023
317 east 3rd street
City Construction Projects
323 1/2 S Lincoln ST
- Case Date:
- 1/27/2023
The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).
City Construction Projects
728 W Allen ST
- Case Date:
- 1/24/2023
Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.
City Construction Projects
Greenwood Ave, Bloomington, IN 47401, USA
- Case Date:
- 1/19/2023
One week ago, people were laying internet cable in our neighborhood. They left last Friday, but there are still sizeable holes in the streets, each of which is an injury and lawsuit waiting to happen. My yard has a hole in the grass and a pile of dirt. There are no covers for these holes, and they are very dangerous for kids and adults (its a walk-to-school route). This work was carried out with no notice to the households, and they left it unfinished with no safety precautions. I live at 1011 S. Greenwood Ave. This photo is of one the holes at the corner of Rose and Dexter, which I have to avoid while biking to work. It's about 10" across. Can you make sure that these holes are covered and that the dirt in my yard is cleared up? Thanks.