uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (26)

closed #179099

Other

2208 S Fairmount CT

Case Date:
2/27/2022

Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.

closed #178598

Sidewalk & Curb Complaints

2105 E Arden DR

Case Date:
1/15/2022

While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.

closed #178373

Street & Traffic Signs

1919 S High ST

Case Date:
12/8/2021

There has always been speed limit signs across from my house and my neighbor’s house (2 specifically are no longer there). They have been taken down since all the construction of our new 10 ft sidewalks. They need to be replaced! Many people are driving 40-50 miles an hour down our street now! With our new extra wide sidewalks, our street has heavy pedestrian traffic in addition to the school just down the street. It may also be partly because it looks like a very wide open road with the huge sidewalks, people feel they can go as fast as they want. A new flashing speed limit sign may be warranted now that the area has changed. Thank you! Please call me 317-362-8947

closed #178314

Blocked Street

2111 E Queens WAY

Case Date:
12/2/2021

Sussex and queens way - there is a car parked facing the wrong way practically in the intersection. This is an accident waiting to happen.

closed #178106

Trails

2101 S High ST

Case Date:
11/7/2021

This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.

closed #177781

Debris Removal

1711 S Sycamore CT

Case Date:
10/4/2021

Construction workers from the path project here along Montclair near Southeast Park entrance left lots of debris behind along the sidewalk. They're long gone and didn't attempt to clean any of this up.

closed #177586

Blocked Sidewalk

2314 E Arden DR

Case Date:
9/23/2021

The sidewalk on Arden leading into Southeast Park has been blocked for weeks now. The Millstone contractors have been using it for construction storage. Could a better spot not be found for storing this equipment, perhaps one that doesn't shut down a pedestrian walkway? Space on the adjoining street could just have easily been used here.

closed #177304

Blocked Sidewalk

2102 E Wimbleton LN

Case Date:
9/7/2021

So we're 15 weeks into our driveways being a mess of gravel and mud. And we have been patient about this, hoping that Milestone will give us what we had before. And yet most of these driveways are garbage.. Ok, but we are still without a driveway, without reasonable access to the street (while paying all those taxes) and still dealing with the sloth of Milestone. Congratulations, Mr Hamilton (Bank Lobbyist), you have created a new republican in Bloomington. You suck.

closed #177091

Sidewalk & Curb Complaints

2105 E Queens WAY

Case Date:
8/22/2021

FINSISH THIS PRJECT

closed #177090

Line of Sight

2115 S High ST

Case Date:
8/22/2021

11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.