uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (24)

closed #166964

Utilities Construction

1600 S Nancy ST

Case Date:
1/4/2019

Smart water meters

closed #165945

Utilities Construction

1607 S Andrew CIR

Case Date:
9/17/2018

Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.

closed #137153

Utilities Construction

2965 S Pinewood LN

Case Date:
4/8/2014

Customer said that CBU did sewer line work in back of her home and now her toilet and bathtub are leaking.

closed #135441

Utilities Construction

936 S Brumley CT

Case Date:
12/2/2013

Customer doesnt like where new water pit was installed. Wants supervisor to call her and explain why?

closed #135264

Utilities Construction

3413 S Glasgow CIR

Case Date:
11/15/2013

VB OR METER LID NEEDS RAISED

closed #135205

Utilities Construction

2231 S Fairmount CT

Case Date:
11/12/2013

water running out of her yard, down sidewalk to sewer drain.

closed #135139

Utilities Construction

700 E Winslow Farm DR

Case Date:
11/5/2013

says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.

closed #134785

Utilities Construction

1900 E Atwater AVE

Case Date:
10/15/2013

Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer

closed #155746

Utilities Construction

6000 S Handy RD

Case Date:
8/29/2013

On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.

closed #133758

Utilities Construction

6000 S Handy RD

Case Date:
8/28/2013

Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.