closed #140704

Drainage or Runoff

913 S Mitchell ST

Case Date:
9/4/2014

Mr Watson left a voice mail message for me on 9/2/14 saying he owns 3 houses on Mitchell St and wants to talk about storm sewers.

closed #148243

Drainage or Runoff

2914 S Atlee CT

Case Date:
9/11/2015

Ms Burnham left a VM for me on Aug 24, 2015 but I was out of the office. She said they have some drainage issues with in the yard and is related to a little drainage ditch that runs at the end of the lots.

closed #149655

Drainage or Runoff

1322 S Winfield RD

Case Date:
11/18/2015

She called Roy Aten first and he forwarded it to me. She is concerned about water ponding in her drive and out into the street since the City put the curb in on Winfield.

closed #168977

Drainage or Runoff

428 W Allen ST

Case Date:
6/16/2019

There’s a blockage or collapse in my drain that goes to the storm drain and continues to back up into my basement

closed #169265

Drainage or Runoff

4413 E Bill Mallory BLVD

Case Date:
7/2/2019

Water leaking at high rate around the house located at 4413 Bill Mallory bd into the water storm drain

closed #169815

Drainage or Runoff

849 S Morton ST

Case Date:
8/11/2019

The neighbor has constructed an in ground planter box within the bioswale. The planter box is constructed with cement brick and alters the flow of water through the bioswale.

closed #170808

Drainage or Runoff

412 E Laurelwood DR

Case Date:
10/24/2019

Please let us know the status of 168780....Stated a work order for a ditch and then listed as closed. When will this ditch be dug!!!!!Addressed to Phil Peden and Ed Sherfield

closed #171362

Drainage or Runoff

2444 E Rock Creek DR

Case Date:
1/6/2020

My U Report #171360 prob ably should have been sent to this department.

open #172010

Drainage or Runoff

1104 S Covenanter DR

Case Date:
3/17/2020

The new builders on the corner of Covenanter Drive and High Street installed a pipe last week. Our concern is that the pipe was not installed low enough to keep the flow of water continuing to High street and beyond. With the rainy season coming...we are concerned that the pipe will make water back up on our property. The city just spent two weeks closing off High street to fix this issue and now we are concerned that the new builders have just put something in (but not properly installed it) so they could have a little rock culvert to get to their property off of Covenanter Drive. I sent an email to Vic Kelson and Brandon Prince on Thursday, but never heard back from them. I am writing again because we would like this matter to be taken care of now before they get more involved with building and it is too late to fix the problem. I would appreciate if somebody would get back with me on this matter. Thank you.

closed #172217

Drainage or Runoff

2017 E Marilyn DR

Case Date:
4/13/2020

Dear Mr. Howard, Mr. Peden, Mr. Meyers, and Mr. Rollo, We are the property-owners at 2017 E Marilyn Dr. abutting Mr. Howard’s residential construction project at 1110 S. Covenanter Dr (http://howardshomeimprovement.com). We're writing because we're concerned about the addition of gravel this past week to Mr. Howard’s lot, raising it several feet above our property, creating what looks sure to become a pond of run-off water along the eastern edge of our property and causing likely flooding at the southern edge. A marshy meadow that used to collect water on Mr. Howard’s property has been shifted onto our property. In order to get a sense of the impacts and the city’s review of them, we are hoping to talk with Mr. Howard and a city inspector before further work proceeds. We are also concerned that the property line has not been staked and our property is being used for construction staging, with considerable removal of vegetation and possible spreading of gravel across the property line. Here is a rough calculation of the drainage runoff from Mr. Howard’s property onto ours: The raised area is 30’+60’+10’=100' X 12’ = 1200 sq ft (at the side) and 22’ + 12’ = 34’ X 10’ = 340’ sq ft (at the back) = 1540 sq ft (total). At an average 5” rainfall in May, that would create 4,800 gallons or 640 cu ft of runoff. Annually, rainfall is about 50” so the runoff would be about 48,000 gallons or 6400 cu ft per year. But with climate change we suspect those amounts are going to increase (rainfall for every month this year has exceeded the norm). We arrived at this estimate using the USGS rainfall calculator: https://water.usgs.gov/edu/activity-howmuchrain.html And we used rainfall estimates from: https://www.weather.gov/ind/Precip_scorecard_IND For the raised area of Mr Howard’s property, we used the schematics attached below. We also have attached photographs showing the construction staging on our property, and the effect of the land build-ups on the east side of our property line. Thank you for your help, Ben and Jenny Robinson