Skip to main content

Page last updated on January 23, 2023 at 8:59 am

Neighborhood Greenways are low-speed, low-volume, shared-space streets that create high-comfort walking and bicycling connections. To see which streets are designated as Neighborhood Greenways, check out the Transportation Plan. In order to create a connected network, the City is prioritizing the design and installation of Neighborhood Greenways recommended in the Priority Bicycle Facilities Network. For 2021, several Neighborhood Greenways are in the works. To design and install Neighborhood Greenways, the City follows the Staff-Led Traffic Calming/Neighborhood Greenways Process. 

Project Map:

This project is on E. 7th Street, from N. Union Street to the 45/46 Bypass. 

7th Greenway Map
A map of the 7th Greenway project area- spanning between N. Union Street and State Road 46

Next Public Input Meetings:

There are no future public input meetings scheduled for this project. Please use this form to provide project feedback or reach out to the Project Contact (listed below). 

Project Description:

Neighborhood Greenways generally involve using traffic calming to create a comfortable shared space street. The design of the street will be based on feedback from the public meetings, best practices, and project goals. 

Eagle Ridge Civil Engineering is the engineering consultant for this project.

 

Project Timeline:

  • Public Input: Spring/Summer 2021
  • Design: Summer/Fall 2021
  • Construction: IN PROGRESS

For Bidding & Construction Information please visit the webpage: Neighborhood Greenway (Graham, Ralston, and 7th) Project | City of Bloomington, Indiana

 

Neighborhood Greenways follow the Staff-Led Traffic Calming/Neighborhood Greenways Process. Here are the steps in the process, and where we are currently. 

  1. Notice Mailing-- notifications via mail were sent for the first virtual project meeting. 
  2. First Meeting: Project Scope and Objectives Meeting-- was held on Tuesday, May 4, 2021 at 5:30pm to 6:30pm. A link to the recorded zoom meeting is posted here. 
  3. Second Meeting: was held on Friday, October 1, 2021 from 3:00pm - 5:00pm, near the intersection of E. 8th Street and N. Overhill Drive. October 21, 2021 is the rain date (please see above for more details). 
  4. Optional other meetings - None.
  5. Open Comment Period - Please see labeled project map below. You may provide feedback on this form
  6. Bicycle and Pedestrian Safety Commission Review- Monday, November 8, 2021 @ 5:30pm for more information please go to the BPSC website
  7. Installation

 

Project Contact:

Sara Gomez
(812) 349-3525 or gomezs@bloomington.in.gov