City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
3073-3099 E Moores Pike, Bloomington, Indiana, 47401
- Case Date:
- 12/6/2019
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
3110 N DAVID DR
- Case Date:
- 7/12/1995
City Construction Projects
312 N Park Ridge RD
- Case Date:
- 5/12/1997
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
City Construction Projects
317 E Allen ST
- Case Date:
- 5/19/2021
The bolts sticking out of the speed bump are a hazard.
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.