closed #139623
Drainage or Runoff
517 W 4th ST
- Case Date:
- 7/29/2014
Ms Glushko left a voice message yesterday about a drain issue.
Ms Glushko left a voice message yesterday about a drain issue.
The drainage ditch in the city right-of-way needs attention.
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Mr Kamen called yesterday afternoon to report his company (Bryan Rental) is working on the home at this address and he is concerned about drainage in the back yard. He knows there is a storm pipe running through the side yard and opens at the railroad ditch but it doesn't seem to go anywhere after that.
says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.
Rick Alexander transferred her VM to me. She called yesterday because there is currently a lot of work being done at 1st and Morton and she's hoping the storm drainage issue can be addressed. There are two storm drains in the area but neither are in the lowest spots so every time it rains, they have huge water issues. She works in the bldg at 1st and Morton.
Resident (Shawn Waylen?) at 7046 S. Shields Ridge Rd. reports that repairs are needed to yard and driveway. The new 36" water transmission pipeline was installed in this area.
Ms Underwood left a voice message for me on Friday 6/27/14 saying she was calling about the brick streets at 8th and Park and the sewer line that currently goes under the street.
Standing water in back yard after rain-neighbor to the east gets water in basement
This complaint was received by Planning on 8/1 and forwarded to CBU. She complained that since the construction of the apartment building at 710 N College Ave, her property to the north is being flooded.