Drainage or Runoff
2017 E Marilyn DR
- Case Date:
- 4/13/2020
Dear Mr. Howard, Mr. Peden, Mr. Meyers, and Mr. Rollo,
We are the property-owners at 2017 E Marilyn Dr. abutting Mr. Howard’s residential construction project at 1110 S. Covenanter Dr (http://howardshomeimprovement.com).
We're writing because we're concerned about the addition of gravel this past week to Mr. Howard’s lot, raising it several feet above our property, creating what looks sure to become a pond of run-off water along the eastern edge of our property and causing likely flooding at the southern edge. A marshy meadow that used to collect water on Mr. Howard’s property has been shifted onto our property.
In order to get a sense of the impacts and the city’s review of them, we are hoping to talk with Mr. Howard and a city inspector before further work proceeds. We are also concerned that the property line has not been staked and our property is being used for construction staging, with considerable removal of vegetation and possible spreading of gravel across the property line.
Here is a rough calculation of the drainage runoff from Mr. Howard’s property onto ours:
The raised area is 30’+60’+10’=100' X 12’ = 1200 sq ft (at the side) and 22’ + 12’ = 34’ X 10’ = 340’ sq ft (at the back) = 1540 sq ft (total).
At an average 5” rainfall in May, that would create 4,800 gallons or 640 cu ft of runoff.
Annually, rainfall is about 50” so the runoff would be about 48,000 gallons or 6400 cu ft per year. But with climate change we suspect those amounts are going to increase (rainfall for every month this year has exceeded the norm).
We arrived at this estimate using the USGS rainfall calculator: https://water.usgs.gov/edu/activity-howmuchrain.html
And we used rainfall estimates from: https://www.weather.gov/ind/Precip_scorecard_IND
For the raised area of Mr Howard’s property, we used the schematics attached below.
We also have attached photographs showing the construction staging on our property, and the effect of the land build-ups on the east side of our property line.
Thank you for your help,
Ben and Jenny Robinson
Drainage or Runoff
1501 S Madison ST
- Case Date:
- 2/20/2018
Complaining about 3 inches of mud in front of his apartment. He's following up from a prior complaint about this location, when he claims that he was told that an environmental study would need to be done before it could be cleaned up, but that it wasn't a priority.
Potholes, Other Street Repair
1206 S MADISON ST
- Case Date:
- 5/23/2017
Outside her complex, on the western side of the building, the parking area has potholes, so they flood after it rains. She suggested the area be trenched and a drain installed so the water does no continue to pool. Whatever the solution, she would be appreciative if it could be fixed!
Sewer Problems (Storm Sewers)
1912 S Wilton DR
- Case Date:
- 7/14/2016
Have been having ongoing issues with storm water running down Wilton St. from Arden Dr. and Hillside Dr.
Was told Wilton St. was going to be repaved (about two years ago). Street patchwork has began washing out.
Storm drains in front of her home were allegedly installed improperly.
Has had minimal contact with Phil Peden, Utilities, but not satisfied with City's actions to date.
Drainage or Runoff
515 S Walnut ST
- Case Date:
- 3/1/2016
Ty left me a voice message indicating they were still having problems with water entering their building in the back alley and believed the Jordan Culvert reconstruction project from a few years ago was the cause.
Drainage or Runoff
1322 S Winfield RD
- Case Date:
- 11/18/2015
She called Roy Aten first and he forwarded it to me. She is concerned about water ponding in her drive and out into the street since the City put the curb in on Winfield.
Drainage or Runoff
104 S Jefferson ST
- Case Date:
- 11/13/2015
He left a VM indicating he has property at 104 S Jefferson and there are drainage issues between the city and the edge of the grass. He called Street Dept first but was told it was a utility issue.
Drainage or Runoff
118 S Jefferson ST
- Case Date:
- 11/12/2015
There is a drainage problem between the yard and the street.
Sewer Problems (Storm Sewers)
2680 S Wexley RD
- Case Date:
- 6/22/2015
Drainage problems, customer would like a new culvert built. Per Tony Eads, I have assigned this to Phil Pedin in CBU Engineering Dept.
Sewer Problems (Storm Sewers)
2146 S White Tail RUN
- Case Date:
- 10/3/2014
Mr Gardner called again this week because he said the pipe under Wylie Farm road is still blocked and nothing has been done since he called in months ago.