This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass. The exact route of this project will be determined during preliminary engineering. The project is programmed to receive federal funding assistance for construction and construction engineering. 

 

Project Timeline:

  • Design: 2018-2019
  • ROW Acquisition: TBD (2020)
  • Construction: TBD (2021)