This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass. The proposed route will be along the eastern edge of West Fountain Drive to North Crescent Road, then north along the eastern edge of North Crescent Road to West 17th Street.  Additionally, the project will reconstruct the intersection of West Fountain Drive and North Crescent Road. The project is programmed to receive federal funding assistance for construction and construction engineering.

Public Input:

The first public meeting was held on September 18th, 2019 at the Bloomington City Hall.  The Project was introduced by the Design Consultant Aztec Engineering followed by a round of questions.  

Displays

Project Timeline:

  • Design: 2018-2020
  • Public Meeting: September 18th, 2019, City Hall, 6 PM
  • ROW Acquisition: 2019 - 2020
  • Construction: Spring 2021

Project Contact:

Roy Aten
(812) 349-3423 or atenro@bloomington.in.gov