Citywide Traffic Signal Retiming This project will update the signal timing of all of the City's traffic signals and pedestrian hybrid beacons and is expected to improve safety and operations for all modes of transportation.
Crestmont Area Traffic Calming Traffic calming devices on 12th Street (Lindbergh to Monroe) and 13th Street (Illinois to Summit) were prioritized through the City's Resident-Led Process of the Traffic Calming and Greenways Program (TCGP).
Crosswalk Improvements Project This project will install or enhance pedestrian crosswalks at 3 locations throughout the City.
Downtown Curb Ramps Phase II This project will improve crosswalks and curb ramps at 15 different locations throughout the downtown area.
Downtown Curb Ramps Project This project will construct new and improved intersection curb ramps in the downtown area to improve safety and accessibility.
E. 3rd Street (Mitchell to Eagleson), E. 3rd Street (Overhill to Mitchell) and Country Club Drive (Walnut to 1097 feet east of Madison) Resurfacing Project