Mitchell St Sidewalk Project This project would install a sidewalk on the east side of Mitchell Street from Circle Drive to Maxwell Drive. The sidewalk would replace the existing striped shoulder on the street. The project would also include stormwater infrastructure along with the curb on the east side of the street.
Moores Pike (College Mall to Woodruff) Sidewalk Project This project would install a sidewalk on the south side of Moores Pike from College Mall to Woodruff Drive.
Moores Pike / Clarizz Blvd. Pedestrian Crossing This project is intended to enhance intersection safety for pedestrians crossing Moores Pike at the Clarizz Blvd intersection.
Morningside (Sheffield to Park Ridge) Sidewalk Project This project will install a sidewalk on the north side of Morningside Drive from Sheffield Drive to Park Ridge Road.
Neighborhood Greenway (Graham, Ralston, and 7th) Project Neighborhood Greenways are low-speed, low-volume, shared-space streets that create high-comfort walking and bicycling connections.
Pedestrian Safety and Accessibility at Signalized Intersections This project will install pedestrian signal heads with countdown timers and accessible pedestrian push buttons at City-maintained traffic signals and pedestrian hybrid beacons.
Rockport Road Sidewalk This project will install a sidewalk on the west side of South Rockport Road from approximately 280 feet southwest of West Graham Drive to South Pinehurst Drive.
Rogers (High to The Stands) Multiuse Path Project This project will install a multiuse path on the north side of Rogers Road from High Street to The Stands Drive/Winding Brook Circle. The project will also provide an improved pedestrian crossing of Rogers Road at The Stands.
S Walnut (Winslow to Ridgeview) Sidewalk This project will install a new sidewalk along the east side of South Walnut Street approximately 350 feet south of Winslow Road to approximately 230 feet south of Ridgeview Drive.
S Walnut St Sidewalk This project would install a sidewalk on the west side of S Walnut Street from approximately 650 feet south of Burks Drive to 1,000 feet north of Burks Drive.
Sare Road Multiuse Path and Intersection Improvements Project This project will construct intersection improvements at the Sare Road-Moores Pike intersection and a multiuse path on the west side of Sare Road from approximately Cathcart Street to Buttonwood Lane.
Sare Road Path Repair This project will remove and replace a damaged section of the South Sare Road Multi-Use Path.
School Zone Enhancements Project This project will install or improve school zones and school-related pedestrian crossings throughout the City. The project is programmed to receive federal funding to aid in construction and construction engineering.
Signal Replacements- 11th & Walnut and 14th & Walnut Traffic signal replacement at 11th & Walnut and 14th & Walnut.